Step by step
7List what the cover will hide
Name each joint, line, framing member, membrane, or barrier going out of sight. Note what each one still needs.
Write down · NotePhotograph it open
Take dated photos of each assembly with its location visible, before anything goes over it.
Write down · PhotoRecord who ran each test
The licensed trade runs pressure or leak tests. Record who ran each one, when, and the result.
Write down · ReadingLeave on any gas odor
If anyone smells gas or sees a leak on gas piping, stop, leave, and call the gas utility.
Write down · DecisionCheck for wet and weak spots
Do not close in wet framing, wet insulation, or moldy board. Check backing, blocking, and plumb while the wall is open.
Write down · NoteGet the inspection sign-off
Book the inspector where one is required. The sign-off must come after the latest test, not before.
Write down · TaskClose it last
Close the work only when every item is recorded. A waiting crew is not a reason to cover it.
Write down · Decision
A finished run leaves photos of the open work, named test records, the inspection sign-off, and the decision to close.
General guidance for a qualified person, not a finding about any home. The person on site decides.