Stop first if
- Cutting or repair is planned on a warranted roof.Read the maker's rules first, and notify the maker promptly.
- Someone asks what the warranty will pay for.Leave warranty language to the maker.
- There is ice, a wet surface, frost, high wind or lightning.Stay off the roof. Log the conditions and that nobody went up.
01
Ask on the call
5Homeowner? These are the questions a good technician will ask you. Having the answers ready makes the first visit count.
- Do you have the warranty document and install date?
- What repair has been done, and with what material?
- When did you first notify the maker?
- What type of roof is it?
- Was anything reused or laid over an old roof during install?
02
Bring
5- Binoculars
- Flashlight
- Moisture meter
- Roof plan sketch sheet
- Phone for photos
03
Check on site
6- Collect the warranty document, tier, install date, install weather and repair history.
- Identify the membrane type and the patch material.
- Note bituminous cement on single-ply, which can deteriorate it.
- Note unsealed tabs that track weather, which point away from the product.
- Note reused flashing, layers, starter, caps and ventilation against the maker's terms.
- Collect coating thickness records and field reports.
04
Keep on the record
5- Warranty document and tier
- Install date and weather
- Patch material with photos
- Date the maker was notified
- Repair history
General guidance for a qualified person, not a finding about any home. The person on site decides.